OUR PROJECTS

The projects our group participated in are mainly,
Here is a brief list of some of our projects.

A-Ring Road Interim Improvement Scheme

DOHA

BOOM CONSTRUCTION – 2019

Butterfly Valves, Gate valve, Flap valves, Air valves

DN 80-400

Al-khor
Expressway
project

DOHA

BOOM CONSTRUCTION – 2019

Butterfly Valves, Gate valve, Flap valves, Air valves

DN 100-1000

Construction and
Upgrading of ERing Road (P008-
C2)

DOHA

DAEWOO E & C – 2019

Butterfly Valves, Gate valve, Flap valves, Air valves

DN 100-1400

QLUS-20243

DOHA

HYUNDAI
ENGINEERING – 2019


Check valves, Air valves, Gate valves

DN 100-300

AL SALIYA

QBC – 2019

Butterfly Valves, Gate valve, Flap valves, Air valves

DN 100-1200

Refurbishment &
Upgrading works
for various
pumping station-CP771

GEC – 2019

Metal Seated Gate Valves, Check valves, Air valves

DN 100-600

Water Mega Reservoir

DOHA

BOOM CONSTRUCTION – 2019

Flow control Valves

DN 1400-1600

GTC 524

DOHA

Tecton – 2018

Flow control Valves

DN 250-900

RPS OLD
SALWA PUMP
STATION

DOHA

Unitech – 2019

Flow control Valves

DN 600

AL JERYAN
RESERVOIR

DOHA

Get Engineering – 2019

Flow control Valves

DN 250

Jordan Projects

Amman one “Desi project”
Amman water
system improvements
KFW Tender
Procurement of water meters, pipes, fittings and safty equipment
MCC projects
Russaifah low waternetworks restructuring and rehabilitation
ZATARI project (UNHCR)
Upgrading the wastewater
network in Zatari project
Madaba project
Water loss reduction in the middle governorates project
Dead sea project
Dead sea development zone
early disposition projects
ZARA MAEN Project
Supplyingsubmersible pumps forZara Maen pumps Stations from Station 1 tell station5